ODW ARRA Projects
|
City of Wilmington |
|
Installation of solar panels at the Wilmington Porter Plant Water Treatment Facility. Back – Wilmington |
|
Driving the pilings to support the solar array. Back – Wilmington |
|
Pilings awaiting installation of solar panels. Back – Wilmington |
|
The solar panels will provide energy for the Wilmington Porter Plant Water Treatment Facility. Back – Wilmington |
|
Installed solar panels. Back – Wilmington |
|
Area view of the support structure for the solar array at the Wilmington Porter Plant Water Treatment Facility. Back – Wilmington |
|
All solar panels installed at the Wilmington Porter Plant Water Treatment Facility. Back – Wilmington |
| Town of Greenwood |
|
Greenwood Well Improvements. Back – Greenwood |
|
Greenwood Project Sign. Back – Greenwood |
|
Well awaiting construction of the new treatment plant. Back – Greenwood |
|
Slab that will be the base of the new treatment plant. Back – Greenwood |
|
New treatment plant constructed March 2010 in Greenwood. Back – Greenwood |
|
New treatment plant constructed in Greenwood. Back – Greenwood |
|
New treatment plant building. Back – Greenwood |
|
Components of the new treatment system. Back – Greenwood |
|
Part of the new treatment system in Greenwood. Back – Greenwood |
|
Control panel for the new treatment system. Back – Greenwood |
|
Secondary containment for NSF approved disinfection. Back – Greenwood |
|
Secondary containment for chemicals used during the treatment process. Back – Greenwood |
|
PVC Used during the project in Greenwood. Back – Greenwood |
|
Meter pits for the Greenwood project were made in Napoleon, Ohio. Back – Greenwood |
|
170 meter pits were brought in for the project. Back – Greenwood |
|
Meter pit prior to installation. Back – Greenwood |
|
Meter ready for installation. Back – Greenwood |
| City of Smyrna |
|
Project signs announce the Monrovia Valves Project. Back – Smyrna |
|
Valve installed during the Monrovia Valves Project. Back – Smyrna |
|
Equipment that was used during valve installation to avoid disruption of service. Back – Smyrna |
|
Sign announcing the Belmont to Sunnyside Road Main Replacement. Back – Smyrna |
|
Sign announcing the Glenwood Development Water Services Replacement Back – Smyrna |
|
Water Main Replacement. Back – Smyrna |
|
Working on the water main replacement in Glenwood. Back – Smyrna |
|
Connecting to the new water main. Back – Smyrna |
|
Excavating the old water main in Glenwood. Back – Smyrna |
|
Water Main Replacement in Glenwood. Back – Smyrna |
|
Connecting to the new water main. Back – Smyrna |
|
Connecting to the new water main. Back – Smyrna |
|
Work area of the Route 13 main replacement in Smyrna. Back – Smyrna |
|
Sign announcing the Route 13 water main replacement. Back – Smyrna |
|
Replacing the water main along Route 13. Back – Smyrna |
|
Working on replacing a water main in Smyrna. Back – Smyrna |
| Town of Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Construction of the new treatment plant and clear well in the Town of Millsboro. Back – Millsboro |
|
Chlorine room inside the new treatment plant in Millsboro. Back – Millsboro |
|
Chemical feed equipment in the new Millsboro treatment plant. Back – Millsboro |
|
Control panels in the new treatment plant. Back – Millsboro |
|
Process flow piping in the new treatment plant. Back – Millsboro |
|
Equipment in the new Millsboro treatment plant. Back – Millsboro |
|
Turbine pumps in the new treatment plant. Back – Millsboro |
|
Lime feed for pH adjustment. Back – Millsboro |
| City of Seaford |
|
Sign announcing ARRA project in Seaford. Back – Seaford |
|
Main replacement on Oak Road. Back – Seaford |
|
Construction materials staged for water main replacement in Seaford. Back – Seaford |
|
Work area of the water main replacements in Smyrna. Back – Seaford |
|
Working on the main replacement in Seaford. Back – Seaford |
|
Replacing the water main in Seaford. Back – Seaford |
|
New manhole cover installed during the Seaford project. Back – Seaford |
|
Road marked for main upgrades to be done in April. Back – Seaford |
|
Recently completed service upgrade in Seaford. Back – Seaford |
|
New meter pit installed as part of the Seaford project. Back – Seaford |
|
Recent main upgrades waiting for road repair. Back – Seaford |
|
Main replacement on Oak Road. Back – Seaford |
|
Recently replaced service line. Back – Seaford |
|
Preparation for new service line. Back – Seaford |
|
Old service line to be replaced. Back – Seaford |
|
Lead gooseneck to be replaced. Back – Seaford |
|
Meter pits for the project were made in Murfreesboro, TN. Back – Seaford |
|
New meter pit. Back – Seaford |
|
Interior view of new meter pit. Back – Seaford |
|
New meter pit installed during the project. Back – Seaford |
|
New hydrant (red top) installed and old hydrant (blue top) to be replaced. Back – Seaford |
| City of Bridgeville |
|
Sign announcing ARRA project in Bridgeville. Back – Bridgeville |
|
Location of the newly installed back-up well. Back – Bridgeville |
|
Soils removed during well installation. Back – Bridgeville |
|
The marked location of the well. Back – Bridgeville |
|
The new backup well. Back – Bridgeville |
|
The newly installed back-up well in Bridgeville. Back – Bridgeville |
|
The area of the newly installed back-up well. Back – Bridgeville |
|
New well completed March 2010. Back – Bridgeville |
|
Completed well with well head protection. Back – Bridgeville |
|
Lock for well head protection. Back – Bridgeville |